top of page

SANITATION

The Sanitation area covers four areas: water supply, sewage, solid waste and drainage. ENGECORPS develops Master Plans, Integrated Regional and Municipal Plans, Atlas of Urban Water Supply, as well as projects and follow-up of sectorization works and water supply systems, sewage networks, treatment plants, landfills, systems of macro and micro drainage.

006 Water Treatment Station, in Palmas

BRK Ambiental – SANEATINS

Basic and final expansion designs of 006 Water Treatment Station in the municipality of Palmas, in the State of Tocantins, were motivated by the need to increase its capacity from 500L / s to 1,270L / s, aiming to serve a population of 475,000 inhabitants. They involved a new collection, a new lifting station and a new raw water pipeline, in addition to the main scope of expansion of Water Treatment Station units. Services included general design, hydraulic, hydromechanical, architectural, structures and foundations, electrical, automation, control and instrumentation designs, geotechnics and technical budget.

Macro drainage Master Plan of Alto Tietê Basin

Department of Water and Electric Energy - DAEE

Third Master Plan for Macro Drainage of the Alto Tietê Basin - PDMAT 3, aiming at reducing the effects of floods caused by floods in the Alto Tietê Basin (BAT). The purpose of PDMAT 3 is to work in an integrated manner on the different structural measures combined with other non-structural measures, such as zoning and urban land use monitoring, hydrometeorological and alert monitoring systems, drainage rate for land with high degree of waterproofing, collection and home storage of rainwater, etc. The Alto Tietê basin drains the most developed region of the country, covering approximately 5.9 thousand km² and 39 municipalities in the State of São Paulo.

Northeast ATLAS – Urban Water Supply

National Water Agency - ANA

Northeast ATLAS – Urban Water Supply, covering the activities of evaluation of the current panorama of the capacity of water supply; supply-demand balance; alternative techniques of compatibility between supply and demand; Reports of Identification of Works - RIOS; definition of institutional arrangement; preparation of the final reports of the study and structuring of the GIS and the Database. The objective of this work was to provide convergence of efforts and articulation of public actions aimed at expanding water supply to the urban population of 1,356 municipalities, including population concentrations and economic poles located in the northeast region of the country and in the north of the State of Minas Gerais.

Regional and Municipal Integrated Sanitation Plans

CSAN – State Secretariat of Sanitation and Water Resources

Regional and Municipal Integrated Sanitation Plans for Water Resources Management Units of Sorocaba and Mid-Tietê - UGHRI 9 and UGRHI 14 (Water Resources Management Units of the São Paulo State Sanitation Secretariat). The studies covered water supply, sewage, solid waste management and urban drainage services, linking them to the public policies of environment, water resources and urban development. The plans were developed for the 41 municipalities that compose UGRHI 9, totaling approximately 1,790,000 inhabitants (in 2034) and for the 36 municipalities that compose UGRHI 14, totaling approximately 800,000 inhabitants (in 2034).

Nova Iguaçu Sanitary Landfill

S.A. Paulista Construções e Comércio Ltda.

Project, technical assistance and management necessary for the implementation of the 1st Stage of the Sanitary Landfill of the City of Nova Iguaçu, located next to the highway that connects this municipality to Adrianópolis, in Baixada Fluminense, State of Rio de Janeiro. The Landfill has the capacity to receive 1,500 t / day of solid household waste and a total capacity of 1,845,000 tons. Next to the landfill, a Health Waste Treatment Unit was designed for inerting of 4 t / day and a Construction Waste Processing Unit of 150 t / day.

Water Treatment Station – ETA VI Indaiatuba

Autonomous Water and Sewage Service of Indaiatuba - SAAE

Basic and Final Designs of ETA VI and other units of the Indaiatuba Water Supply System, in the State of São Paulo, for the Autonomous Water and Sewage Service of Indaiatuba. The objective of the work was the completion of the water supply system of the municipality. The activities resulted in the basic and final designs of Water Treatment Plant VI, which has a production capacity of 300L / s, and is composed of the collection components, raw water lifting station, pre-treatment system, rapid mixing, flocculation, decantation, filters, disinfection, reservoirs totaling 2000m³ and treated water lifting station. It also included the project of architecture, urbanism, landscaping, drainage and road system of the complex.

Please reload

bottom of page